Warren Middle School
Forney ISD
Project Scope
- Track: liner, flexbase, concrete curb, track surfacing, and field events installation
- Field: excavation, water injection, flex base cap, drain stone layer, elayer installation, and synthetic turf installation
Products
- Turf: Shaw Sports Turf Powerblade Pro
- Pad: Elayer
- Infill: Sand & rubber
- Track: PTS 4000 sandwich system