Warren Middle School

Forney ISD

Project Scope

  • Track: liner, flexbase, concrete curb, track surfacing, and field events installation
  • Field: excavation, water injection, flex base cap, drain stone layer, elayer installation, and synthetic turf installation

Products

  • Turf: Shaw Sports Turf Powerblade Pro
  • Pad: Elayer
  • Infill: Sand & rubber
  • Track: PTS 4000 sandwich system