Project Scope
Track: liner, flexbase, concrete curb, track surfacing, and field equipment installation
FB field: drain stone layer, elayer installation, and synthetic turf installation
BB/SB fields: concrete perimeter curb, drainage system, drain stone layer, synthetic turf installation, and installation of equipment