Crockett Early College High School

Austin ISD

Project Scope

  • Excavate subgrade to new elevations and compact to proper density & moisture
  • Installation of concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • Asphalt basemat paving
  • Application of sandwich track surfacing

Products

  • Turf: Shaw Sports Turf Game On hybrid
  • Pad: Schmitz ProPlay 20
  • Infill: Sand & Amorim Ice
  • Track: PTS 4000 sandwich system