Summit High School Softball

Mansfield ISD

Project Scope

  • Excavate subgrade to new elevations and compact to proper density & moisture
  • Water injection
  • Installation of concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • New R-panel metal outfield fencing

Products

  • Outfield: Shaw Sports Turf Game On hybrid
  • Infield: Shaw Sports Turf TruHop
  • Warning track: Shaw Sports Turf Momentum Pro
  • Infill: Sand & Rubber