PROJECT SCOPE
• Excavate subgrade to new elevations and compact to proper density + moisture
• Lime stabilization
• Installation of concrete perimeter curb, drainage system, and drain stone layer
• Installation of synthetic turf system
• Revegetation of natural grass around infields