Project Scope
• Demo of existing track
• Excavate subgrade to new elevations and compact to proper density and moisture
• Water injection and lime cap
• Concrete perimeter curb, liner, drainage system, and drain stone layer
• Installation of synthetic turf system with soccer and lacrosse lines
• Installation of new 9-lane sandwich system running track with colored exchange zones
• Pole vault, shot put, and steeplechase