Pilot Point High School Baseball

Pilot Point ISD

Project Scope

  • Removal of existing grass field
  • Excavate subgrade to new elevations and compact to proper density & moisture
  • Installation of concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • Installation of home & visitor bullpens with fencing

Products

  • Grass areas: Shaw Sports Turf Legion Pro
  • Base path & pitcher’s mound: Shaw Sports Turf TruHop
  • Warning Track: Shaw Sports Turf Momentum Pro
  • Infill: Sand & Rubber

01 / 01

  • “What truly set Paragon Sports apart was their commitment to communication and relationships. By the end of the project, it felt far less like working with a contractor and far more like partnering with trusted colleagues and friends. In today’s school construction environment, that level of connection and trust is rare.”


    Dr. Brant Perry | Assistant Superintendent of Operations and Student Services