Project Scope
• Excavate field to new subgrade and compact to proper density + moisture
• Chemical injection and flexbase cap
• Liner, drainage, and drain stone layer
• Installation of synthetic turf system
• Installation of all weather track surfacing
• Field lighting
• Water quality and detention pond installation