James Madison High School

Highland Park ISD

Project Scope

  • Demo of existing field
  • Excavation of subgrade & compaction to proper density & moisture
  • 5’ moisture conditioning
  • Concrete curbs, drainage system, liner & drain stone layer
  • Installation of synthetic turf system
  • Asphalt paving
  • Application of spray coat track surfacing

Products

  • Turf: Shaw Sports Turf Powerblade Pro
  • Infill: Sand & Rubber
  • Track: Paragon Track Surfaces 2000 spray coat system