James Madison High School
Highland Park ISD
Project Scope
- Demo of existing field
- Excavation of subgrade & compaction to proper density & moisture
- 5’ moisture conditioning
- Concrete curbs, drainage system, liner & drain stone layer
- Installation of synthetic turf system
- Asphalt paving
- Application of spray coat track surfacing
Products
- Turf: Shaw Sports Turf Powerblade Pro
- Infill: Sand & Rubber
- Track: Paragon Track Surfaces 2000 spray coat system