Project Scope

  • Excavation of subgrade & compaction to proper density & moisture
  • Moisture conditioning
  • Drainage system, liner & drain stone layer
  • Installation of synthetic turf system
  • Asphalt paving
  • Application of sandwich track surfacing

Products

  • Turf: Shaw Sports Turf Legion Pro
  • Pad: Schmitz ProPlay 20
  • Infill: Sand & Rubber
  • Track: Paragon Track Surfaces 4000 sandwich system

01 / 01

  • “In my 28-year career in education, I have had the opportunity to work with many companies on a variety of construction projects. Paragon is the company that consistently excels in demonstrating a professional relationship throughout the entire process, with an emphasis on integrity and accountability to the needs of the client.”