Bulldog Stadium

Iola ISD

Project Scope

  • Demo of existing grass field
  • Excavation of subgrade & compaction to proper density & moisture
  • Water injection
  • Lime stabilization
  • Concrete curbs, drainage system, liner & drain stone layer
  • Installation of synthetic turf system
  • Asphalt basemat paving
  • Application of spray coat track surfacing

Products

  • Turf: Shaw Sports Turf Legion NXT
  • Pad: Brock SP 17 XL
  • Infill: Sand & Rubber
  • Track: PTS 2000 spray coat system

01 / 01

  • “Iola had an excellent experience working with Paragon Sports Constructors on the construction of our turf field and track. From start to finish, their team demonstrated professionalism, expertise, and attention to detail. The quality of their workmanship is outstanding, the turf looks fantastic, and the track is perfectly installed. They maintained clear communication throughout, making the entire process smooth and stress-free. I highly recommend Paragon Sports Constructors to anyone looking for reliable and skilled sports facility construction.”


    Jeff Dyer | Iola ISD Superintendent