Crockett Early College High School
Austin ISD
Project Scope
- Excavate subgrade to new elevations and compact to proper density & moisture
- Installation of concrete perimeter curb, drainage system, liner, and drain stone layer
- Installation of synthetic turf system
- Asphalt basemat paving
- Application of sandwich track surfacing
Products
- Turf: Shaw Sports Turf Game On hybrid
- Pad: Schmitz ProPlay 20
- Infill: Sand & Amorim Ice
- Track: PTS 4000 sandwich system