Waco Carver Middle School Track & Field

Waco ISD

Project Scope

  • Installation of concrete curbs, flexbase, and asphalt
  • Installation of PTS 2000 spray coat system
  • Installation of long/triple jump runway with sand pits and take-off boards, pole vault boxes and runways, & discus and shot put pads

Products

  • Paragon Track Surfaces 2000 spray coat system