Thrall High School Baseball

Thrall ISD

Project Scope

  • Excavate subgrade to new elevations and compact to proper density & moisture
  • Concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • Bleachers with shade structures & pressbox
  • Masonry dugouts with storage unit on home side
  • Covered batting cages with interior lighting
  • Concrete backstop wall with netting & padding
  • R-panel outfield fence & black vinyl chain link fencing down foul lines
  • Electrical system
  • Concrete & flatwork around fields
  • Exterior sod & irrigation system

Products

  • Grass areas:  Shaw Sports Turf Legion Pro
  • Base path & pitcher’s mound: Shaw Sports Turf TruHop
  • Infill: Sand & rubber

01 / 01

  • “We received a great product with significant value at a fair price and done by a superior team of leaders.  The president, William Chaffe, and his administration are hands-on as much as necessary with a family-oriented approach.  The added value they provide by ideas that surfaced during the process was quality decisions all the way to the finish line where details regarding warranty have been seamless.”


    Tommy Hooker | Thrall ISD Superintendent