Larry & Eyleen Crain Field

Abilene Christian School

Project Scope

  • Excavate subgrade to new elevations and compact to proper density + moisture
  • Concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • Padded football goal posts

Products

Turf: Shaw Sports Turf Legion Pro
Infill: Sand & Rubber

01 / 01

  • “Mason Mullen and Paragon Sports did a tremendous job helping us achieve a dream that was a decade in the making. They met every timeline established and cooked hot dogs for us at the inaugural game. It was a tremendous group of people and experience. I highly recommend PSC.”


    Kirk Wade | Abilene Christian School Superintendent