Haltom High School

Birdville ISD

Products

  • Turf: Shaw Sports Turf PowerBlade Bolt
  • Track: Conica SP
  • Facility renovation included retaining walls, lighting, new track and synthetic turf playing field.

Project Scope

  • Excavate subgrade to new elevations and compact to proper density + moisture
  • Concrete perimeter curb and drainage system
  • Installation of synthetic turf system
  • Installation of track asphalt and all weather track surface