Haltom High School
Birdville ISD
Products
- Turf: Shaw Sports Turf PowerBlade Bolt
- Track: Conica SP
- Facility renovation included retaining walls, lighting, new track and synthetic turf playing field.
Project Scope
- Excavate subgrade to new elevations and compact to proper density + moisture
- Concrete perimeter curb and drainage system
- Installation of synthetic turf system
- Installation of track asphalt and all weather track surface