Dailey Middle School
Del Valle ISD
Project Scope
- Excavate field to new subgrade and compact to proper density + moisture
- Chemical injection and flexbase cap
- Liner, drainage, and drain stone layer
- Installation of synthetic turf system
- Installation of all weather track surfacing
- Field lighting
- Water quality and detention pond installation
Products
- Turf: Shaw Sports Turf Legion NXT
- Pad: Brock YSR
- Infill: Sand & rubber
- Track: Paragon Track Surfaces PTS 5010 10mm full-pour