Camp Carter Athletic Complex Softball
Castleberry ISD
Project Scope
- Excavate subgrade to new elevations and compact to proper density + moisture
- Concrete perimeter curb, drainage system, liner, and drain stone layer
- Improved site drainage with berm + detention pond
- Bleachers and press box
- Upgraded sound system
- Installation of synthetic turf system
- Renovated dugouts with railing, lights, helmet & bat racks
- Covered batting cages with turf, netting & lights
- Concrete backstop walls and backstop netting + padding
- Revegetate natural grass surrounding areas
Products
- Grass areas: Shaw Sports Turf Legion Pro
- Infield: Shaw Sports Turf TruHop
- Infill: Sand & Rubber