Camp Carter Athletic Complex Baseball

Castleberry ISD

Project Scope

  • Excavate subgrade to new elevations and compact to proper density + moisture
  • Concrete perimeter curb, drainage system, liner, and drain stone layer
  • Improved site drainage with berm + detention pond
  • Bleachers and press box
  • Upgraded sound system
  • Installation of synthetic turf system
  • Renovated dugouts with railing, lights, helmet & bat racks
  • Covered batting cages with turf, netting & lights
  • Concrete backstop walls and backstop netting + padding
  • Revegetate natural grass surrounding areas

Products

Grass areas: Shaw Sports Turf Legion Pro
Base path & pitchers mound: Shaw Sports Turf TruHop
Infill: Sand & Rubber

01 / 01

  • “Paragon Sports Constructors is an elite contractor in the turf industry. Their attention to detail is impeccable. Great customer service with the flexibility to get the job completed on time. We have done multiple projects with PSC with great success and would definitely recommend them for future projects!”


    Lenny Lasher | Assistant Superintendent of Student Services, Facilities, and Operations