Polk Middle School

Carrollton Farmers Branch ISD

Project Scope

  • Excavate subgrade to new elevations and compact to proper density & moisture
  • Installation of concrete perimeter curb, drainage system, liner, and drain stone layer
  • Installation of synthetic turf system
  • Asphalt basemat paving
  • Application of spray coat track surfacing

Products

  • Turf: Shaw Sports Turf Powerblade Pro
  • Infill: Sand & Rubber
  • Track: PTS 2000 spray coat system